Bidding Opportunities
Higland Canal Reconstruction Burks Blvd
KG WALTERS CONSTRUCTION CO INC
Request for MBE/WBE quotes from subs and suppliers
Bid open date: 8/8/2012
KG Walters Construction is seeking qualified certified MBE/WBE subcontractors and suppliers for the Truckee Meadows Water Authority Highland Canal Reconstruction Burks Blvd. Bid No. 1213-110. The project is located in Reno, NV. Quotes requested include but aren't limited to the following scopes of work: earthwork, concrete formwork, ac paving, rebar, erosion control, traffic control, rockfall protection, engineered slope stability system, concrete, precast concrete box culverts, asphalt concrete, structural fill, base rock, water and storm drain pipe, erosion control material. Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor. Standard payment terms are 90% progess payments, 10% retention unless other terms are provided for in prime contract and bonds are provided at no cost to contractor. We are an equal opportunity employer.


