opportunity FAA ATCT, Base Building/TRACON, & Parking Garage
contractor McCarthy Building Companies, Inc.
intro Bids Wanted
bid open 07/28/2010
bid closed 08/13/2010
support doc none
details Construction of a major activity Airport Traffic Control Tower (ATCT), base building/Terminal Radar Approach Control Facility (TRACON) and parking structure at McCarran International Airport, Las Vegas, Nevada. The ATCT will be an approximately 350 feet tall structure consisting of 22 levels with the top level being an 850 SF cab. The main structural components of the ATCT shaft will be cast-in-place concrete and structural steel. The ATCT construction may also include a tuned mass damper. The ATCT will be linked to a four story 55,000 SF base building/TRACON constructed of cast-in-place concrete and structural steel. The detached 2 level parking structure will support approximately 200 vehicles and will be constructed of cast-in-place concrete, pretensioned precast concrete and structural steel. The facility will be constructed on a 3.5 acre site just west of Terminal 3 and located outside, but adjacent to, the airport security fence. The work includes site clearing and restoration, access road construction and improvement, excavation and backfill, drilled concrete shaft foundations, cast-in-place reinforced concrete, structural steel, plumbing, mechanical, electrical and landscaping. Please forward Bids/Proposals via e-mail to lvbids@mccarthy.com or via fax to 702-990-6714. McCarthy Building Companies, Inc., an equal opportunity employer, requests bids from qualified subcontractors and suppliers for the above project. In addition to any requirements that the Owner may have, McCarthy requires that (1) subcontractors having subcontract amounts over $250,000 provide performance and payment bonds and (2) suppliers having purchase order amounts greater than $500,000 provide contract supply bonds. All bonds are to be for 100% of the subcontract or purchase order amount, as applicable, and from a surety listed in U.S. Treasury Circular 570. If your firm is listed as a proposed subcontractor in any listing required by law or the contract documents, such listing and subsequent award of a subcontract is contingent on your firm providing bonds meeting both Owner and McCarthy requirements. Bid documents may be downloaded from SmartBidNet or obtained from McCarthy on CD. Contact Karie Lawson at (702) 990-6707. Address pre-bid RFIs to Jason Howard at jhoward@mccarthy.com or fax to (702) 990-6714
back to opportunities list